BPM309: Cost Management for M&E Works Assignment, SUSS, Singapore An M&E Engineer prepares the tender drawings (Figure Q1.1) for a hose reel and dry riser system
University | Singapore University of Social Science (SUSS) |
Subject | BPM309: Cost Management for M&E Works |
Question 1
An M&E Engineer prepares the tender drawings (Figure Q1.1) for a hose reel and dry riser system. Briefly describe the scope of works of the fire protection system to be installed and illustrate the associated measurement rules and principles.
Question 2
Interpret Figures Q2.1, Q2.2, and Q2.3 in the Appendix and apply suitable measurement techniques to work out the bills of quantities to install electrical works for the transformer room and switch room.
Question 3
The Facilities Manager of a shopping center is planning to upgrade the existing CCTV system to an IP type of system. Therefore, the Facilities Manager has assigned the task to the engineer to prepare the documents to invite three contractors to submit quotations for the upgrading works. Prepare the itemized cost breakdown for the CCTV upgrading work and illustrate the associated measurement rules and principles.
Hire a Professional Essay & Assignment Writer for completing your Academic Assessments
Buy Custom Answer of This Assessment & Raise Your Grades
At Myassignmenthelp.sg, we believe that academic assistance should be accessible to everyone. That’s why we offer our services at the most competitive rates. Our mission is to help students achieve their academic goals and excel in their studies without breaking the bank. So, if you need help with report writing, don’t hesitate to reach out to us. Our professional assignment helpers are ready to provide you with superb academic support that will exceed your expectations. Contact us today and experience the difference!
- NCO113 GBA01: Managing Conflict and Collaboration in Project Teams: A Role-Play Case Study
- GSP110 ECA: Introduction to Personal Financial Planning
- BUS287 Group Assignment: Management Accounting: A Financial and Strategic Analysis
- BUS303 Team Project Question: Tax Liability Assessment for Miss Duck Hollow
- FMT315 ECA: Green Mark Certification Feasibility and Upgrade Plan for Shinsei Industries
- CFP Assignment 02: Financial Strategy, Growth, and Industry Impact (KHEA)
- ECE372 ECA: Musicking, Moving and Storying with Young Children Semester 2025
- Healthy Lives Assignment: Comprehensive Health Promotion Strategy 2024-2025
- MKT371 ECA: Data Analysis and Strategic Insights for Kimberly-Clark Semester 2025
- LOG307 Report: Optimization and Simulation for Production Planning
UP TO 15 % DISCOUNT