DCE003: ESTIMATION AND COSTING Assignment, Singapore You are the quantity surveyor of your company and recently your company is taking part in the tender to build a single story house
University Singapore University of Social Science (SUSS)
Subject DCE003: ESTIMATION AND COSTING
Posted on: 13th Jun 2023

DCE003: ESTIMATION AND COSTING Assignment, Singapore You are the quantity surveyor of your company and recently your company is taking part in the tender to build a single story house

The purpose of this assignment is to:

 L01: Understand the types of estimation used in the construction industry.

L02: Understand analysis of rates used in the construction industry.

L03: Understanding various excavation types.

L04: Understand different methods of taking out estimates.

L05: Understanding different methods of valuations.

Questions

1. You are the quantity surveyor of your company and recently your company is taking part in the tender to build a single story house. Based on the following tender drawing and table you calculate the following using center line method:

S. No Description of work Unit No Measurements Volume
L B H
1 Excavation for foundation M3
2 Concrete in foundation M3
3 Brick work in cement mortar

1st step

2nd step 3rd step

4th step

5th step

M3
5 Interior-Plastering works ( deduct at doors and windows) M3
6 Brick works volume from ground floor level to ceiling level M3

a. Earth work for foundation volume

b. Lime concrete volume in foundation

c. Brick work with cement mortar volume

d. Interior-Plastering works ( deduct at doors and windows)

e. Brick works volume from ground floor level to ceiling level (25 marks)

2. Calculate the number of cement bags, sand & aggregate for M 20 (1:1.5:3) & M15 (1:2:4) concrete having a volume of 19 m3 & 35 m3 respectively.

Calculate the sand & cement requirements for 2 m3 of CM 1:6 & CM 1:4

Estimate the quantity of earthwork for a portion from the following data:

Road length 0m 30m 60m 90m 120m 150m
FORMATION RL 210 209 208 207 206 205
EXISTING RL 206.80 205.20 203.00 204.50 202.00 201.50

3. Prepare a lead statement for the following items: –

S. No Material Rate at source Lead in KM Conveyance charges $ per KM Cess charges $
MT CT ST
1 Cement $2500/      1 TONS 5 5 3 6 25
2 Bricks $95/1000 Nos 2 5 6 7 20
3 Sand $25/m3 7 8 9 10 35
4 40mm HBG metal $300/m3 8 6 7 9 15

The formation level starts at RL 210.000 and the chainage length assumes 30m. The proposed road shall be at the falling gradient of 1 in 30. The side slope shall be 2:1 and the width of the road shall be 10m. Use the Mid-section rule, Trapezoidal rule & Prismoidal rule.

4. Estimate the quantity of earthwork for a portion from the following data:

Road length 0m 30m 60m 90m 120m 150m
FORMATION RL 210 209 208 207 206 205
EXISTING RL 206.80 205.20 203.00 204.50 202.00 201.50

5. Prepare an estimate for a proposed commercial complex for a private owner and following are the given data:-

a. Plinth area-1500 m2/floor

b. Height of each floor- 4m

c. No of storeys-G+5

d. Cubical content rate- S$32/m3

Provided the below are the percentage of the structured cost

a. Water supply & Sanitary- 4.5% for each of them

b. Electrical-7%

c. Fluctuation rates- 5%

d. Contractor profit-12%

e. Petty supervision- 4%

6. What are the various methods of valuation and briefly explain

7. Briefly explain various types of excavation works with pictures

Buy Custom Answer of This Assessment & Raise Your Grades

Get Help By Expert

Looking for assignment help in Singapore for your DCE003: ESTIMATION AND COSTING assignment at Singapore University of Social Sciences (SUSS)? Look no further! Our expert team is here to assist you. As the quantity surveyor of your company, we understand the importance of accurate estimation and costing in tendering for projects like building a single-story house. Our experienced professionals can provide you with top-notch assistance in completing your TMA, individual assignments, and even offer an exceptional essay writing service. Don't let the stress of your coursework overwhelm you; trust our reliable service to help you excel in your studies. Pay our experts and gain the confidence you need to succeed!

Categories:-
Tags:- COSTING ASSIGNMENT DCE003 SUSS
Answer
No Need To Pay Extra
  • Turnitin Report

    $10.00
  • Proofreading and Editing

    $9.00
    Per Page
  • Consultation with Expert

    $35.00
    Per Hour
  • Live Session 1-on-1

    $40.00
    Per 30 min.
  • Quality Check

    $25.00
  • Total
    Free

New Special Offer

Get 30% Off

UP TO 15 % DISCOUNT

Get Your Assignment Completed At Lower Prices

Plagiarism Free Solutions
100% Original Work
24*7 Online Assistance
Native PhD Experts
Hire a Writer Now
My Assignment Help SG Services
My Assignment Help SG

Rated 4.9/5 Based on 22945 Singaporean Students