Posted on: 11th Nov 2025

ACFI 2070 Business Finance Individual Assignment – The University of Newcastle (UoN)

Problem Set (50 marks)

[This problem set contributes 25% to your overall mark in this course.]

[You should answer all the questions.]

Question 1 – Investment Evaluation (15 marks)

Rust Industrial Systems Company is trying to decide between two different projects.

a. Project A requires an initial investment of $320,000 in equipment, has a four-year life, and generates earnings before interest & tax (EBIT) of $110,000 per year.

b. Project B costs an initial investment of $450,000 in equipment, has a six-year life, and generates earnings before interest & tax (EBIT) of $100,000 per year

Equipment in both projects are to be depreciated straight-line to zero over their lives and will have zero salvage value. Both projects will require additional investment in working capital of $25,000, which will be recovered at the end of the project (year 4 for Project A and year 6 for Project B). The interest expense will be $10,000 per year.

If the tax rate is 21 percent and the discount rate is 8 percent, which project should the firm choose?

Hire a Professional Essay & Assignment Writer for completing your Academic Assessments

Question 2- Investment Evaluation (15 marks)

A company is evaluating whether to replace its existing production machine with a newer, more efficient model. The new machine costs $1.2 million and will be depreciated straight-line to zero over its six-year life. It is expected to be worth about $150,000 at the end of six years.

The old machine is being depreciated at a rate of $150,000 per year with current book value of $450,000 (fully depreciated in three years). The old machine can be sold now for $300,000, but in two years, it will likely have a resale value of $100,000. The new machine is expected to reduce annual operating costs by $250,000. The company’s tax rate is 25%, and the discount rate is 10%. If the company does not replace the machine now, it will have to replace it in two years. Should the company replace it now or wait? (Hint: This is a choice between “investing” in keeping the old machine or investing in the new one. Note that the two options have unequal lives.)

Question 3 (10 marks)

The following table outlines the information for 3 risky assets. Assume the correlation between the returns on assets A and B is 0.6, the correlation between the returns on assets A and C is 0.2 and the correlation between the returns on assets B and C is -0.8. The risk-free rate is 2%

A B C
Expected return E(R) % 10% 12% 16%
Risk (σ %) 4% 6% 8%

a. If you are considering an equally weighted portfolio of B and C, calculate the portfolio’s expected rate of return and standard deviation of rates of return. (4 marks)

b. If you are considering an equally weighted portfolio of A, B and C, calculate the portfolio’s expected rate of return and standard deviation of rates of return. (4 marks)

c. The investor must develop a complete portfolio by combining the risk-free asset with one of the risky assets. Which risky asset will be preferred? (2 marks)

Question 4 (10 marks)

The following table outlines the information for 2 risky assets. Assume the correlation between the returns on assets A and B is perfect negative (i.e. coefficient ρ = -1).

A B
Expected return E(R) % 12% 20%
Risk (σ %) 6% 10%

a. Determine the proportions of a portfolio to be made up of A and B such that this portfolio is risk free. (3 marks)

b. How should we allocate capital between Asset A and Asset B in order to construct a portfolio with a standard deviation of return equal to 4%? (7 marks)

Buy Custom Answer of This Assessment & Raise Your Grades


My Assignment Help SG Editorial Team

Shared with

My Assignment Help SG Editorial Team – Business Finance desk

A student shared this brief with our team; personal details have been removed. Our Business Finance desk works on tasks like this and can guide you on how to approach it.

Get Help By Expert

Struggling with your ACFI 2070 Business Finance assignment at The University of Newcastle? You’re not alone — many students find it challenging to evaluate investment projects, apply discounting techniques, and interpret portfolio risk calculations accurately. At My Assignment Help SG, our finance professionals deliver AI-free, human-written UON assignment help tailored to UoN’s marking rubrics. Moreover, we assist you in mastering NPV, IRR, depreciation, taxation, and portfolio diversification concepts with real-world precision. Each report is Turnitin-safe, plagiarism-free, and formatted to university standards. Get expert assignment help SG today and achieve higher scores with confidence.

Tags:-
Answer
Social and New Media Written Report (40%): Website Message and Method Analysis with Strategic Recommendations | Murdoch
No Need To Pay Extra
  • Turnitin Report

    $10.00
  • Proofreading and Editing

    $9.00
    Per Page
  • Consultation with Expert

    $35.00
    Per Hour
  • Live Session 1-on-1

    $40.00
    Per 30 min.
  • Quality Check

    $25.00
  • Total
    Free

New Special Offer

Get 30% Off

Hire an Assignment Helper and Earn A+ Grade

UP TO 15 % DISCOUNT

Get Your Assignment Completed At Lower Prices

Plagiarism Free Solutions
100% Original Work
24*7 Online Assistance
Native PhD Experts
Hire a Writer Now

Facing Issues with Assignments? Talk to Our Experts Now! Download Our App Now!