Posted on: 9th Aug 2023
COM203: Consulting and freelance Assignment, MU, Singapore My Assignment 2 is based on Quantity Surveying Consultancy Services which has to relate to what the client ‘Get Fit Pte Ltd
University | Murdoch university (MU) |
My Assignment 2 is based on Quantity Surveying Consultancy Services which has to relate to what the client ‘Get Fit Pte Ltd’ may be looking for right now for their new fitness studio.
- To assume they will be carrying out renovation works as well as the supply & installation of gym equipment for their studio.
- SurveySmart Co. to offer their service on
- Prepare Bills of quantities for the renovation works& gym equipment supply based on the client’s proposed design intent or brief to call for tender.
- Conduct cost analysis (procurement) of tenderers, to compare cost & design requirement based on budget given by ‘Get Fit Pte Ltd’
- Cost negotiation on behalf of ‘Get Fit Pte Ltd’, monitor the budget, and control any variation orders during the process.
- Closing and finalizing accounts with contractors.
Stuck with a lot of homework assignments and feeling stressed ? Take professional academic assistance & Get 100% Plagiarism free papers
Tags:-
COM203 MU
Answer
Recent Solved Questions
- MGT201 Managing Self And Others Assignment: Exploring Generation Z’s Workplace Challenges, Wellbeing through the PERMA Model, and Effective Leadership Styles
- EBM 3005 Energy Management and Audit Assignment : Energy Efficiency in a Water-Cooled Central Chilled Water Plant and Air Distribution System
- HRM331 Talent Management Assignment: Strategic Approaches to Talent Management and Employee Engagement at Innova Code
- BUS357 Starting and Managing a Business Assignment: Evaluating the Feasibility of Travel With Host (TWH) – A Personalised Travel Platform
- Communication Studies Individual Assignment: Professional Job Application for a Singapore-Based Role
- PSY376 Psychology of Trauma, Theories and Applications Assignment: Cyberbullying and PTSD — Evaluating the Digital Threat Through DSM-V Criteria
- PSB505IT Human Computer Interaction and Web Development Assignment : User-Centered Redesign and Development of a Web-Based Information System
- PSB500EN Control of Mechatronics Systems Coursework 2 : Modeling and Control of a Nonlinear Underwater Thruster Using State Space and Linearization
- QSM202 Construction Measurement (2 of 4) Architectural and M&E Works Assignment : SMM-Based Measurement and Analysis of Wall, Floor, and Ceiling Finishes
- PSS221 Urban Security and Resilience Assignment: Strategic Approaches to Enhancing Safety and Resilience in [Bangkok/Manila/Yangon]
UP TO 15 % DISCOUNT