ENG233 Internet of Things Assignment, SUSS, Singapore: Define at least FOUR (04) operational challenges while operating and managing earth-moving
Question 1
Define at least FOUR (04) operational challenges while operating and managing earth-moving equipment at a construction site that the SBC digitalization team shall address (an as-is situation, in the absence of SAMS). Estimate the impact of those problems on sustainability goals (SDGs). Propose a prioritization matrix/rubric to rank identified problems from high to low in priority of importance. (Provide a table with quantitative and qualitative reasons, a prioritization rubric, and a description.)
Question 2
Plan and describe the improved operational workflow of managing earth-moving equipment to reduce operational waste. Propose the SDGs that can be achieved by addressing those wastes and map them against the corresponding SDG#. (Provide a workflow diagram, map SDGs on workflow, and description.)
Question 3
Recommend the potential technologies for each of the four stages of the SAMS. (Provide a table with quantitative and qualitative reasons and a description.)
(i) Type of relevant data to be sensed and how.
(ii) Connectivity & communication protocols to transfer the data to the next stages.
(iii) Computing infrastructure, data analytics layer to manage and analyze the data.
(iv) Applications to analyze and visualize the data.
Question 4
Design the integrated FOUR (04) stages end-to-end solution using technologies recommended in Question 3 to address the problems identified in Question 1 and improve workflow in Question 2. Recommend a scalable solution to address the multiple construction sites. (Provide a solution diagram and a description.)
Question 5
Appraise any TWO (02) cyber security challenges that you may need to address in your proposed SAMS. Appraise their risks and discuss the steps to be taken in order to mitigate those risks in the proposed SAMS. (Provide a table and a description.)
Question 6
Verify the benefits of the proposed IoT solution by outlining how the SBC operations team can leverage the data and intelligence generated by the proposed IoT solution to improve their operations in new ways. (Provide a description.)
Question 7
Propose a Return of Investment matrix “cost-based” for the proposed SAMS. Provide a table and a description. List TWO (02) criteria. (Provide a table with quantitative reasons.)
Question 8
Propose a Return of Investment matrix “value-based” for the proposed SAMS. Provide a table and a description. List TWO (02) criteria. (Provide a table with quantitative reasons.)
Hire a Professional Essay & Assignment Writer for completing your Academic Assessments
- Final Assignment: Migrating FashionOnline’s Infrastructure to AWS: A Strategy for Enhanced Availability and Data Protection
- HRM331: Talent Management – Strategic Shift from the War for Talent to the Wealth of Talent
- Marginalised Populations – The Structural and Cultural Exclusion of People Experiencing Homelessness in Singapore
- CVEN3501 Assignment 2: Groundwater Modelling of Drawdown from a Pumping Bore
- CSCI312 Assignment 2: Conceptual Modelling and Implementation of a Data Warehouse and Hive Queries
- CH2123 Assignment: Fugacity, VLE Modeling & Applications of Henry’s Law
- BAFI1045 Assignment -Constructing and Evaluating Passive and Active Portfolios Based on the Straits Times Index (STI)
- FIN2210E/FIN2212E Group Assignment: Financial Risk Management Analysis of Bursa Malaysia Companies
- FLM101 Assignment: A Film Analysis: Stylistic Techniques and Their Thematic Importance
- HRM Assignment Answer: Talent Transformation in the Age of AI: Turning Challenges into Opportunities via Ecosystem Innovation
UP TO 15 % DISCOUNT