Physical Security Assignment, Singapore: The Singapore government plans to grant a license for a new flight training school to be built
University | New Flight Training School (NFTS) |
SECURITY PROJECT – PROPOSED DEVELOPMENT
1 The Singapore government plans to grant a license for a new flight training school to be built and operated in northern Singapore. It will be built on a public-private partnership (PPP) model. Since it is a PPP model development, the government has indicated it will also station a fleet of light aircraft that may be used for visits by key government officials/ VIPs.
2 The project team has developed a Master plan showing the site layout for the new development. It is attached as an
appendix to Annex A.
3 A 2.8m high welded mesh fence will demarcate the site’s perimeter. The Security Control room is planned to be placed next to this main entrance. There will be a Training Centre Building within the site where lessons will be conducted, a runway, an aircraft parking area, and a general engineering maintenance building. A Control Tower is planned to be located outside the site (in the adjacent area, similar to our Changi Airport). The current design is based on other regional flight training schools the project team has built.
4 A VIPs complex has been allocated for VIPs/ visiting dignitaries to use this facility for visits to neighboring countries. The VIP complex is planned to have large glass windows facing the sea. A 2-storey block (consisting of a 2-level basement carpark and 2 levels of commercial/retail floors) is also planned to use glasses extensively. A canal separates the 2-storey block and the Training Centre proper and runs underneath the runway. A stormwater drain cuts through the boundary of the site perimeter and similarly runs underneath the runway.
Buy Custom Answer of This Assessment & Raise Your Grades
- 5010MKT/2005MKT Ice Cream Launch Marketing Plan: Singapore Strategy for Growth, Profitability & Sustainability
- BUS306 Audit Risk Assessment : Outback Retail Ltd Case Study for ERP, BNPL & Governance Evaluation
- CVE2322 Concrete Materials Laboratory Report: Observations, Analysis, and Reflections from SIT Lab and iLab Visit
- PSB6008CL Social Entrepreneurship Assignment: Case Study on Impact-Driven Innovation & Leadership in a Social Enterprise
- PSB6014CL Project Management Assignment : Digital Transformation Case Study in Online Banking Services for a Leading Financial Institution
- Financial Management Assignment : Global Case Study for Corporate Valuation, WACC & Scenario-Based CAPEX Analysis
- CM1040 Web Development Assignment : HTTP & Responsive Design Case Study for Accessible and Secure User Experience
- Master Budget Report 2025: SBS Industrial Budgeting, Performance & Financial Analysis
- 7WBS2009 Financial Analysis Assignment Report: Investment Decision Between Alpha plc and Beta plc for Gamma Company
- PSB7003CL Entrepreneurship and Innovation Assignment Report: Evaluating Innovation Practices in Organisation
UP TO 15 % DISCOUNT