CVE2322 Recyclable Gantry Design Assignment Project: Sustainable Civil Engineering Model Challenge
University | Singapore Institute of Technology (SIT) |
Subject | CVE2322 Civil Engineering Material |
1. General Assignment Information
Assignment Value: | 30% |
Submission Type: | Group work with INDIVIDUAL submission |
Submission Method: | Video (.mp4) of your model and PDF file uploaded to xSITe |
Due Date: | Week 8 (23 June 2025, Monday) – Model video Week 10 (11 July 2025, Friday) – Project reflection report on xSITe |
Result/type: | Letter Grade. |
2. Assignment Requirements
In this exercise, you will work in your team (maximum 5 persons) to design, construct and film a model GANTRY made of reclaimed materials that can be recycled after the project. The GANTRY should be able to support a container filled with 500 ml of water. You will decide on the structural form of the gantry and the detail and type of structural members and connections.
Make use of your knowledge of civil engineering materials (Lecture 1 and Lecture 2) and Statics and Structure Mechanics when conceptualising your model. Document your individual personal reflections of the conceptualisation, build experience, and group video presentation session in a two page report to be submitted in Week 10. Students may wish to highlight some key learning points related to civil engineering material properties and showcase sustainable development concepts in your report.
Hire a Professional Essay & Assignment Writer for completing your Academic Assessments
Students may engage in a friendly competition for:
- The most recyclable and longest span i.e. longest horizontal distance between base supports, and;
- The most impressive video.
Some pointers to note:
- 3R principles must be adhered to.
- Teamwork is important.
- Model gantry should take you no more than 2 hours to construct and film.
- Fastening methods may include glue, strings, tape or other relevant materials.
- The gantry base(s) must fit within a total area of one sheet of A4 paper.
- The tower must be free standing and not secured to the ground nor external supports.
- Video should show the entire gantry and be no more than 60 seconds.
- Note a Reflection Report is NOT a Project Report.
- Generative AI (gAI) tools permitted and encouraged if used responsibly and ethically. NOTE: punitive penalties will be applied for abuse of gAI e.g. if your report is inconsistent with your video submission.
Buy Custom Answer of This Assessment & Raise Your Grades
- BMG706 Strategic Quality Change Assignment Report: Enhancing Operational & Quality Management at any Organization
- CVE2323 Structural Systems Report: Analytical & Computational Study of Portal and Frame Structures
- BMK3015 Major Project Assignment Report: Real-World Marketing Solutions for Industry Client Using Research Insights
- BCLO001 Business Statistics Assignment: Exercise Duration Analysis Among Temasek Polytechnic Students
- BM4364 Customer Experience Management Report: Evaluating CX Practices Through Employee Interview in the Service Industry
- GSFM7514 Financial Decision-Making Assignment: Analysis of Costing, Budgeting, and Investment Strategies for SAC, MEMC, and CCID
- BM0973 Crisis Management Assignment: BCRM Analysis of the 2022 Genting Highlands Landslide Disaster
- AC0779 Strategic Management Assignment Essay: Culture’s Role in Shaping Healthcare Strategy and Organisational Outcomes
- ComfortDelGro Organisational Structure Assignment: Analysis for UNGC-Aligned Sustainable Transport Strategy
- Bomb Threat Incident Management Assignment: Response Plan for High-Risk Facilities in Singapore
UP TO 15 % DISCOUNT