CSCI322 Systems Administration Assignment, UOW, Singapore: Create the DNS zone file for the new zone “myuni.edu.au’ and its reverse zone file.
University | University of Wollongong (UOW) |
Task 1: DNS configuration
Create the DNS zone file for the new zone “myuni.edu.au’ and its reverse zone file. The new domain will occupy the IP ranges 192.168.1.0/24.
a. Setup the DNS on the host dns.myuni.edu.au.
b. In their SOA records, serial numbers must be prefixed with the current date and have a two-digit update number suffix: yards, e.g. 2020090901
c. Add a single MX record for each zone with priority 50 which will direct to smtp.myuni.edu.au.
d. Add appropriate A records and PTR records for the following physical hosts:
server1.myuni.edu.au 192.168.1.10
server2.myuni.edu.au 192.168.1.11
pc2.myuni.edu.au 192.168.1.22
pc3.myuni.edu.au 192.168.1.23
e. Add “www” CNAMEs to “server2”; “dns” to “server1”; and “smtp” to “server1”. (You can assume that the glue records will be handled by somebody else.)
Task 2: Network planning (you don’t need to implement this task in VM) A university has a main campus and a remote campus at another location. The default router to the Internet on the main campus has an IP address of 10.0.0.1/24. The main campus network is connected to the Internet through a router called RouterA (Router A and the default router are two different routers). The main campus has no more than 15000 staff and students. The remote campus network is connected to the main campus network through a router called RouterB. The remote campus has no more than 200 staff
and students. All staff and students should be able to access to the Internet and to the resources on both campuses.
Your task is to plan the campus networks.
a) Propose appropriate subnet ranges for both campuses from the 16-bit prefix block of IPv4 private addresses (i.e., 192.168.0.0/16) *R. Answer the question with your calculation.
b) Draw a diagram to depict the networks with IP addresses notated with CIDR notation assigned to all interfaces of bother routers for two campuses. Label the interfaces of routers on the diagram using eth0 or eth1.
c) Show the routing table of the RouterA that meets the requirements of both campuses. Show the columns of Destination, Gateway, Genmask, Flags, and Iface in the routing table as shown by the Linux command route.
Hire a Professional Essay & Assignment Writer for completing your Academic Assessments
- SOC307 Classical Social Thought Tutor-Marked Assignment 02
- 7WBS2007-0901-2025 Human Resource Management Assignment 1 Brief 2025
- MKTG1270 Product Innovation Management Authentic Case Assessment – Semester 2, 2025
- BSE315 Recreational Sport Programme Management End-of-Course Assessment – July Semester 2025
- CVE2151 Transportation Engineering Assignment – Highway and Traffic Engineering
- Law of property Assignment Part 1 Questions
- BPM113 Construction Technology Tutor-Marked Assignment Two July 2025 Presentation
- BC2406 Analytics I: Visual and Predictive Techniques AY2025 Computer Based Assessment (CBA)
- Visual Arts Management Assignment 1 Coursework – Singapore Art Science Museum
- BUS366 Lean Six Sigma End-of-Course Assessment – July Semester 2025
UP TO 15 % DISCOUNT