BPM209 Cost Management for C&S Works Assignment, SUSS, Singapore: With reference to Figures 1 and 2, interpret the drawings and scope of the C & S works
Question 1
(a) Explain the meaning of “deemed to be included” and its implication on pricing as used in CP 97.
(b) Identify the clauses and explain the extra works/labours that are deemed to be included in the description and measurement of:
(i) Bored piles (15 marks)
(ii) Structural Steelwork (10 marks)
Question 2
With reference to Figures 1 and 2, interpret the drawings and scope of the C & S works.
(a) Apply measurement technique to prepare a take-off list, cite the relevant clauses from CP 97 for measuring the excavation, concrete and brick works including associated damp-proof materials.
(b) Apply measurement technique to take off quantities for the excavation works.
(c) Apply measurement technique to take off quantities for the concrete, formwork and hard-core layer.
(d) Apply measurement technique to take off quantities for the brick wall and damp proofing materials. (Note: Brick wall is to be measured up to the damp proof course level).
Stuck with a lot of homework assignments and feeling stressed ? Take professional academic assistance & Get 100% Plagiarism free papers
Specifications:
1. The existing ground level is fairly flat. Over site excavation is to commence from existing ground level (EGL).
2. Surplus excavated materials are to be disposed off site.
3. Hard core shall be of broken bricks and stones, well compacted and blind with a layer of sand at the top.
4. Lean concrete shall 75 mm thick and of grade 15.
5. Reinforced concrete for strip foundation and ground slab shall be of grade 35.
6. Formwork shall be of sawn timber.
7. Damp proofing materials shall be 20 mm thick, comprising 2-layers of hessian based bituminous felt.
8. Brick wall shall be 225 mm brick thick in common bricks, laid English bond and bedded & jointed in cement and sand mortar (1:3).
Question 3
With reference to Figures 3 and 4, interpret the drawings and scope of the C & S works.
(a) Apply measurement technique to take off quantities for the steel Lattice Girder (Assume twelve sets of girders, each 2.00 m high. The bearing level of the steel truss is at 5.50 m above the existing ground level).
(b) Apply measurement technique to take off quantities for the steel portal frame structure (Assume nine sets of portal frame).
Specifications:
1. Haunches shall be cut from 356 x 127 x 33 UB
2. Base plates shall be 750 x 750 x 25 mm thick
3. Holding down bolts shall be 4 x 20 mm diameter x 450 mm long at each base.
Buy Custom Answer of This Assessment & Raise Your Grades
Looking for a reliable assignment helper in Singapore for your Dispute Resolution assignment at Singapore Management University (SMU)? Look no further! At Assignment Help SG, we specialize in providing top-notch assistance to students like you. Whether it's your GBA, Summative assessment, or you simply need comprehensive assignment help, our expert team is here to help.
Tags:-
- Imagine that you are currently working for a precision medicine startup: Machine Learning Paper Review in Precision Medicine, Written Assignment 1, NUS, Singapore
- Go Business offers PSG solutions for enterprises in Singapore: Collective Intelligence and Entrepreneurship, Assignment 1, JCU, Singapore
- Design an ontology based on- Accidents can be categorised as chemical, electrical, fire, kinetic or liquid: Collective Intelligence and Entrepreneurship, Assignment 1, JCU, Singapore
- Project Control Monitoring, Assignment, HU, Singapore: Deliberate Project MONITORING AND CONTROL or PMC Identification
- DSM500: Final Project Report, Coursework 2, UOL, Singapore
- DSM080: Financial Markets, Assignment, UOL, Singapore: A grapefruit juice futures contract is for 15,000 pounds of frozen grapefruit juice
- DSM080: Financial Markets, Assignment, UOL, Singapore: The share price of a certain stock today is $42.50, and five-month European style call options with a strike price of $45 currently sell for $4.25.
- DSM080: Financial Markets, Assignment, UOL, Singapore: A trader who is working in the gold markets is able to borrow money at the interest rate of 7% per annum
- DSM080 Financial Markets, Assignment, UOL, Singapore: A dollar-based American corporation has decided that it will have to pay 6 million UK pounds in three months
- Principle of Finance Assignment, UCD, Singapore: National Gaming Inc. (National) operates the weekly lottery in the country
UP TO 15 % DISCOUNT