University | Nanyang Technological University (NTU) |
Subject | Aircraft Maintenance |
Aircraft Maintenance Case Study, NTU, Singapore On April 28, 1988, at 1346, a Boeing 737-200, N7371I, operated by Aloha Airlines Inc., as flight 243, experienced an explosive decompression
On April 28, 1988, at 1346, a Boeing 737-200, N7371I, operated by Aloha Airlines Inc., as flight 243, experienced an explosive decompression and structural failure at 24,000 feet, while en route from Hilo to Honolulu, Hawaii. Approximately 18 feet from the cabin skin and structure aft of the cabin entrance door and above the passenger flooring separated from the airplane during flight.
There were 89 passengers and 6 crewmembers onboard. One flight attendant was swept overboard during the decompression and is presumed to have been fatally injured; 7 passengers and 1 flight attendant received serious injuries.
The flight crew performed an emergency descent and landed at Kahului Airport on the island of Maui. The National Transportation Safety Board determines that the probable cause of this accident was the failure of the Aloha Airlines maintenance program to detect the presence of significant disbanding and fatigue damage which ultimately led to the failure of the lap joint at S-10L and the separation of the fuselage upper lobe.
Contributing to the accident was the failure of Aloha Airlines management to supervise properly its maintenance force; the failure of the FAA to evaluate properly the Aloha Airlines maintenance program and to assess the airline’s inspection and quality control deficiencies; the failure of the FAA to require Airworthiness Directive 87-21-08 inspection of all the lap joints proposed by Boeing Alert Service Bulletin SB 737-53A1039; and the lack of a complete terminating action after the discovery of early production difficulties in the B-737 cold bond lap joint which resulted in low bond durability, corrosion, and premature fatigue cracking.
Stuck with a lot of homework assignments and feeling stressed ? Take professional academic assistance & Get 100% Plagiarism free papers
Achieve academic excellence in Singapore with our comprehensive educational services. Welcome to Assignment Helper, your dedicated partner for success. As students at the prestigious Nanyang Technological University (NTU), we understand the significance of Summative assessments and navigating challenging Individual Assignments. Our expertise extends to offering proficient Online Exam Help tailored to your needs. Delving into the intriguing Aircraft Maintenance Case Study, our experts provide insightful solutions. Invest in your academic journey with our unwavering support at NTU, Singapore. Trust us to be your academic ally, ensuring excellence in every facet of your education
- ELG101: Discovering Language Assignment, SUSS, Singapore: Speakers are creative users of the languages they speak. In our everyday interaction
- ELG101: Discovering Language Assignment, SUSS, Singapore: Demonstrate the articulation of the words in the above data set using the International Phonetic
- Principles of Project Management Individual Assignment, SUSS, Singapore: You are appointed a Project Manager in charge of organising and planning a project
- COR2223: Frontiers of Modern Computing Final Written Assignment, SMU, Singapore: Write a short story imagining a future scenario and how one or more of the modern computing technologies
- AC2101: Accounting Recognition and Measurement Assignment, NTU, Singapore: If NTU-C were to record the abovementioned transactions on 31 January, 28 February and 15 March 20×2
- BSE217: Motor Development, Control and Learning Assignment, SUSS, Singapore: Create a rating scale or categories of differentiation to rate the movement proficiencies of the individual
- BSE217: Motor Development, Control and Learning Assignment, SUSS, Singapore: Discuss the main theoretical foundations of Ecological Dynamics Theory
- NCO201: Learn To Learn, Learn For Life Tutor-Marked Assignment 2, SUSS, Singapore: Create a learning plan. Use this template to create your learning plan
- NCO201: Learn To Learn, Learn For Life Tutor-Marked Assignment 2, SUSS, Singapore: Self-reflection is a critical part of learning. By looking back at your process and analysing
- BPM301: LCC and Sustainable Design and Construction Assignment, SUSS, Singapore: A developer is building a new 3-storey sports complex on a 10-year leasehold land
UP TO 15 % DISCOUNT