QSM202 Construction Measurement (2 of 4) Architectural and M&E Works TMA-02 July 2025
University | Singapore University of Social Science (SUSS) |
Subject | QSM202 Construction Measurement (2 of 4) Architectural and M&E Works |
Question 1
(a) Cite the relevant SMM clauses, illustrate with diagrams and examples the difference between measuring the general ceiling areas and the sides and soffit of suspended beams for:
i) In-situ finishes
(8 marks)
ii) Preformed tile finishes
( 8 marks)
(Note: Answers to include the reasons for the differences in approach to measurement)
(b) Explain and illustrate clearly with diagrams and examples how SMM clause 11.02f and 11.02g is applied when measuring timber plates and bearing timber in relation to the provision of joint allowances.
(Note: Student must illustrate and explain using different types of joints and timber lengths)
(14 marks)
Hire a Professional Essay & Assignment Writer for completing your Academic Assessments
Question 2
Figures Q2.1 to Q2.3 show the plan and section of a pitch tiled roof. Apply measurement techniques to take-off quantities for the following works:
(a) Roof coverings including associate underlays
(15 marks)
(b) Structural timber members including wall plates
(20 marks)
(c) Fascia, barge, soffit boards and timber bearers
(15 marks)
Specifications:
- Roof tiles shall be Hugenot HP 10 clay interlocking tiles with matching ridge, and eave tiles and fixed to 50 x 30 mm timber battens @ 300 mm c/c with galvanized nails.
- Roof tiles shall protrude from fascia board by 75 mm over the gutter.
- Special tiles shall be required at ridge, verges and eaves of roof.
- All roof timber shall be keruing preserved timber.
- Underlay shall comprise of two layers of bitumen felt overall 12 mm thick.
- Roof insulation shall be 50 mm thick fibre glass with double sided sisalation foil 450 and laid on fabric mesh 3325 to underside of roof covering.
- Pitch of roof is laid at 45 degrees slope.
- The first and last rafters shall be placed at 100 mm away from the brick gable end walls and spaced at 600 mm c/c
- Wall plates shall be placed on eaves brick walls between gable walls
- Ridge board shall be 75 x 300 mm thick
- Fascia board shall be 275 x 30 mm thick hard board.
- Barge board shall be 275 x 30 mm thick hard board
- Eaves soffit boards shall be installed at eaves and verges and shall be painted with three coats of enamel paint.
- Timber vertical and horizontal bearers shall be 300 mm long and install to support soffit boards at eaves and verges.
- All structural timbers shall be scarfed jointed except for wall plates (lap joints). All boards shall be butt jointed.
- All dimensions are in millimetres unless otherwise indicated.
Figure Q2.1: Plan of Pitch Tiled Roof
Figure Q2.2: Section A-A of Pitch Tiled Roof
Figure Q2.3: Details at Ridge
Buy Custom Answer of This Assessment & Raise Your Grades
Question 3
(a) Cite the various SMM clauses and explain the difference between measuring metal doors and frames versus timber doors and frames.
(12 marks)
(b) Apply measurement techniques and take off quantities for the metal door shown in
Figure Q3.1.
(8 marks)
Specifications:
- Metal door shall be 45mm thick single leaf, Hercules Tacam or other approved equivalent 4H blast resistant fire rated steel door complying with SS 332:2007
- Hardware shall be proprietary Tacam multi point lockset, heavy duty hinges, flush bolt and door handle.
Figure Q3.1: Metal Door
Figure Q3.2: Metal Door Frame Detail
—- END OF ASSIGNMENT —-
Stuck with a lot of homework assignments and feeling stressed ? Take professional academic assistance & Get 100% Plagiarism free papers
Many students struggle with construction measurement assignments because they involve technical SMM clauses, diagrams, and accurate take-off methods. If you find tasks like roofing quantities, timber works, or finishes measurement challenging, expert help can make your work easier and error-free. At My Assignment Help SG, we provide thesis assignment help that is plagiarism-free, AI-free, and aligned with academic standards. For trusted support in architectural and M&E works, explore our professional assignment writing help Singapore today.
- HBC203 Statistics and Data Analysis for the Social and Behavioural Sciences TMA-02
- 7025CL Management Finance Coursework 2 Assignment: Financial Appraisal of Ecofabz’s Sustainable Investment
- SOC307 Classical Social Thought TMA – 01: Tocqueville on Equality and Freedom in Modern Democracies
- ANL312 Text Mining and Applied Project Formulation End-of-Course Assignment July 2025
- NCO101 Living with Community TMA-01: Envisioning an Ideal Inclusive Community through Ratcliffe’s Concept of Race, Ethnicity, and Difference
- Investment Finance Assignment: A Comprehensive Financial and Strategic Analysis of Palantir Technologies (PLTR) for Informed Investment Decision-Making
- BPM113 Construction Technology Assignment: Lessons from Disaster – A Case Study on the Hyatt Regency Walkway Collapse
- BPM105 Construction Law TMA-01: Legal Analysis and Contractual Issues in Residential Renovation Project
- Corporate Governance & Corporate Social Responsibility Assignment: An In-Depth Analysis and Strategic Advisory for Sustainable Corporate Excellence
- Financial Technologies and Innovations Assignment: Analyzing Block Inc.’s Fintech Promises, Challenges, and Ethical Considerations
UP TO 15 % DISCOUNT