FMT101 Building Services (TMA01) Assignment: energy-efficient and fire safety strategies
University | Singapore University of Social Science (SUSS) |
Subject | Building Services |
TUTOR-MARKED ASSIGNMENT ONE (TMA01)
This assignment is worth 14% of the final mark for FMT101 Building Services.
The cut-off date for this assignment is 9 March 2025, 2355hrs.
Note to Students:
You are to include the following particulars in your submission: Course Code, Title of the TMA, SUSS PI No., Your Name, and Submission Date.
Collusion and Plagiarism is a serious offence and your Turnitin report will be examined thoroughly as part of the marking process. All works from other authors must be appropriately cited and listed in a bibliography – failure to comply with proper referencing measures will be penalized.
Question 1 (50 marks)
You are a consultant for a new commercial office building project in Singapore that aims to achieve energy efficiency while maintaining a comfortable indoor environment.
(a) Propose and describe with justification, the type of air-conditioning system you would recommend for the building.
You are to consider options like Variable Refrigerant Volume (VRV), Chilled Water Systems, or Direct Expansion (DX) systems in your proposal. (25 marks)
(b) You have been tasked with evaluating the choice between a Constant Air Volume (CAV) system and a Variable Air Volume (VAV) system for this building.
(i) Identify the key differences between CAV and VAV systems in terms of design, operation, and energy efficiency. (6 marks)
(ii) Discuss the advantages and disadvantages of each system for a commercial office setting. (12 marks)
(iii) Recommend which system would be more suitable for achieving energy
efficiency and occupant comfort in Singapore’s tropical climate. Justify your
recommendation. (7 marks)
Question 2 (50 marks)
You have been appointed as the project manager for a new 30-story mixed-used residential and office building. The client wants to ensure that the building complies with fire safety standards while also optimizing cost and reliability.
(a) Design and describe a fire protection strategy that incorporates the use of automatic sprinkler systems, dry and wet risers, and hose reel systems.
Explain your choices, considering the different sprinkler systems (wet pipe, dry pipe, pre-action, and deluge systems) and their suitability for various building zones (e.g., residential units, car parks, or server rooms). (30 marks)
(b) Discuss potential challenges in implementing these systems in a high-rise building and how you would address them to ensure compliance with fire protection standards. (20 marks)
Hire a Professional Essay & Assignment Writer for completing your Academic Assessments
- Corporate Veil Piercing Analysis Assignment : UK, Singapore, and Delaware Case Study on Limited Circumstances
- Tableau Data Storytelling Assignment 2: County Health Rankings Analysis & Action Plan
- S3419C Active Ageing & Elderly Care Assignment Report: Madam Tan Case Study on Health, Nutrition & Well‑Being
- S2070C Senior Living & Quality of Life Assignment: Singapore Case Study on Ageing Theories, Policies & Resources
- B1059C Counselling & Coaching Skills Assignment : Intake Session Case Study with Reflection Paper
- CCD2C03 Ethical Hacking and Intrusion Prevention Assignment : Artworks Pte Ltd Case Study for Secure VAPT Implementation
- MBA Career Development Portfolio: What Employers Want Analysis and Future Success Action Plan
- Principles of Economics Assignment: Real-World Demand & Supply Analysis and Key Economic Concept
- BM4062 Business Storytelling Assignment : Behavioural Change at RWS through Sustainability-Themed Presentation
- Research Methodology Assignment Report: Comparative Analysis, Instrument Design & Dissemination Strategy
UP TO 15 % DISCOUNT