QSM202 Construction Measurement (2 of 4) Architectural and M&E Works Assignments
QSM202 Construction Measurement (2 of 4) Architectural and M&E Works TMA-02 July 2025
Question 1 (a) Cite the relevant SMM clauses, illustrate with diagrams and examples the difference between measuring the general ceiling areas and the sides and soffit of suspended beams for: i) In-situ finishes (8 marks) ii) Preformed tile finishes (…
QSM202 Construction Measurement (2 of 4) Architectural and M&E Works
|
September 17th, 2025
QSM202 Construction Measurement (2 of 4) Architectural and M&E Works Assignment : SMM-Based Measurement and Analysis of Wall, Floor, and Ceiling Finishes
TUTOR-MARKED ASSIGNMENT ONE (TMA01) Question 1 (a) Cite the relevant SMM clauses, identify and describe any TEN (10) items of work that are deemed to be included in the description and measurement of each item of wall and ceiling finishes.…
QSM202 Construction Measurement (2 of 4) Architectural and M&E Works
|
August 21st, 2025
No Need To Pay Extra
OUR LATEST QUESTIONS
- CVE2151 Transportation Engineering Assignment – Highway and Traffic Engineering
- Law of property Assignment Part 1 Questions
- BPM113 Construction Technology Tutor-Marked Assignment Two July 2025 Presentation
- BC2406 Analytics I: Visual and Predictive Techniques AY2025 Computer Based Assessment (CBA)
- Visual Arts Management Assignment 1 Coursework – Singapore Art Science Museum