BPM213 Procurement Management TMA02: Sustainable Procurement and Tendering 2025
| University | Singapore University of Social Science (SUSS) |
| Subject | Procurement Management |
TUTOR-MARKED ASSIGNMENT TWO (TMA02)
This assignment is worth 14% of the final mark for BPM213 Procurement Management.
The cut-off date for this assignment is 23 March 2025, 2355 hrs.
Note to Students:
This TMA covers materials studied in Study Unit 4, 5 and 6. You should review these materials in both your textbook and the unit notes before beginning the assignment. In addition, you will find it necessary to perform additional research in order to provide better answers to the questions.
You are to include the following particulars in your submission: Course Code, Title of the TMA, SUSS PI No., Your Name, and Submission Date.
Project Information
An autonomous University plans to build a new Convention Centre with the goal of earning the Zero Energy Building (ZEB) Award under its sustainable campus initiative.
To ensure sustainability, the Convention Centre will be built using eco-friendly materials such as mass engineered timber, incorporate energy and water efficiency features, and follow universal design principles.
Key sustainable features include a passive induction air-conditioning system, natural daylight, and water conservation measures.
The University is leveraging green technologies and innovative construction for this project, using Prefabricated Pre-finished Volumetric Construction (PPVC) to enhance speed and productivity. With an $80 million budget for the Convention Centre, it will use a Design & Build contract and procure the contractor via Selective Tendering.
You are to advise on tender document preparation, specification writing styles, and incorporating sustainable elements for this project.
Part A: Tender Documentation
1. Explain the purpose and the main content of the following tender documents for the Convention Centre project. You must also prepare a sample document for each listed item.
(a) Criteria on pre-qualification of tenderers (8 marks)
(b) The Tender Notice (8 marks)
(c) The Conditions of Tendering (8 marks)
(d) The PQM Evaluation Criteria Table (8 marks)
Hire a Professional Essay & Assignment Writer for completing your Academic Assessments
Part B: Specifications
2. Answer the following relating to specifications for the Convention Centre project.
(a) Identify the most suitable specification type for the project and compare it
with other types of specifications. Provide reasons to support your answer.
(10 marks)
(b) Draft THREE (3) specification clauses for each of following:
• Sustainable construction materials
• Energy efficient features
• Smart technological adoption
(18 marks)
(c) Explain the differences between general specification and technical
specification, including how they are used, their content and order of
arrangement.
(12 marks)
Part C: Electronic and Sustainable Procurement
3. The University intends to adopt electronic processes and sustainable procurement strategies for this project.
(a) Discuss the advantages and difficulties in implementing electronic
procurement platforms to facilitate procurement processes, from sourcing to
the award of contractor. Include both the University’s and tenderers’
perspectives in your answer.
(14 marks)
(b) Discuss the procurement strategies, from design through to operations, that consistently maintain sustainable features and systems. Examine how they meet the requirements of the “Zero Energy Building” (ZEB) award and ensure sustainable operations throughout the building’s life cycle.
(14 marks)
Buy Custom Answer of This Assessment & Raise Your Grades
- GPS2301 Interventions & Strategies in Special Needs Education Assignment 2026 | TP
- PSB7022CL Marketing in a Global Age Assignment 2, 2026 | Coventry University
- PSB5045EE Analog and Digital Electronics (ADE) Assignment Questions 2026
- LG71011 Cold Chain Logistics Assessment Project 2026 | ITE College
- BUSM2578 Integrated Perspective on Business Problems Assignment 1 2026 | RMIT
- GSS502 Global Security, Strategy and Leadership Tutor-Marked Assignment – 01, 2026 | SUSS
- MGT567 Strategic Human Capital and Talent Management End-of-Course Assessment 2026 | SUSS
- PSB7006CL Entrepreneurship Business Plan Assessment Coursework 1 2026 | PSB
- FMT321 Fire Safety & Engineering Tutor-Marked Assignment – 02, 2026 | SUSS
- B3029C Career Counselling Project Coursework Assessment 2026 | RP
