FMT309 Building Diagnostics TMA01: Building Condition Assessment & Maintenance Strategy
| University | Singapore University of Social Science (SUSS) |
| Subject | Building Diagnostics |
TUTOR-MARKED ASSIGNMENT ONE (TMA01)
This assignment is worth 20% of the final mark for FMT309 Building Diagnostics.
The cut-off date for this assignment is 20 February 2025, 2355hrs.
Note to Students:
You are to include the following particulars in your submission: Course Code, Title of the TMA, SUSS PI No., Your Name and submission Date.
Collusion and Plagiarism is a serious offence and your Turnitin report will be examined thoroughly as part of the marking process. All works from other authors must be appropriately cited and listed in a bibliography – failure to comply with proper referencing measure will be penalised.
Question 1: Building Condition Survey
Your facility management company has successfully bided a tender for a full contract sum of S$30 million to manage and maintain a mixed-use development for a period of FIVE (5) years, with an option to renew for a further period of another FIVE (5) years. You are assigned to conduct a thorough building condition assessment of the buildings and take over the buildings from the incumbent facility management company.
For the purpose of this assignment you may conduct a condition assessment of the building at your workplace or any building that you are currently managing, e.g. medical centre, hospital, retail mall, office tower, school, data centre, industrial or residential building. The building must be at least FIVE (5) storeys high, including basements, if any.
You are required to prepare a building condition survey report, highlighting at least TEN (10) most common different building defects (with photographs), i.e. TWO (2) defects for each of the following main components of the building, and assess the severity of each defect based on an appropriate Code of Condition of Assessments:
• Concrete structures
• Hard finishes, e.g. ceramic/porcelain, vinyl, timber tiles, etc
• Doors
• Windows
• Roof
Your report should include a desktop study to examine and discuss the possible cause(s) of the defects; and design and recommend possible remedial solutions for the building owner to follow up with the term contractors.
You may adopt any of the following Codes of Condition of Assessments:
(a) Construction Quality Assessment System (CONQUAS) 2022.
(b) The Dutch Standards for Assessment of Buildings’ Condition (NEN2767).
(c) United Kingdom Housing Health and Safety Rating System (HHSRS) or
(d) Portuguese Method for Building Condition Assessment.
Your report should be presented in the following format:
1. Objective of Report
2. Building Brief/Information – (including façade)
3. Condition Assessment – (including rating & severity assessment)
4. Desktop Study(total at least 10 defects)
5. Conclusion, Recommendations and Limitations (60 marks)
Hire a Professional Essay & Assignment Writer for completing your Academic Assessments
Question 2: Building Envelope
(a) Refer to Question 1 above. Façade is an important physical barrier separating between the external and internal environment of a building. It acts as a barrier or resistance to air, water, heat, light and noise transfer. Base on the building that you have conducted the condition assessment survey, interpret and discuss the diagnosis of FOUR (4) common façade defects of the building. (8 marks)
(b) Formulate façade accessibility strategies for façade inspections and to carry out the appropriate repair or replacement of these defects. (12 marks)
(Total marks for Question 2 – 20 marks)
Question 3: The 3M – Maintenance, Management, Mitigation
(a) Refer to Question 1. Based on the results of the condition assessment survey discuss FIVE (5) strategic objectives to monitor the performance of assets and make forwardlooking decisions to deliver the desired level of service to the customers. (5 marks)
(b) Interpret and examine the following maintenance concepts that you may consider optimizing the total asset life cycle:
• Business Continuity Plan Maintenance (BCM)
• Reliability Centred Maintenance (RCM)
• Total Productivity Maintenance (TPM) (9 marks)
(c) Taking into consideration the condition of the building you have surveyed formulate the maintenance management strategies to optimize the total asset life cycle. (6 marks)
(Total marks for Question 3 – 20 marks)
Assignment Presentation
(a) Cover / content / reference page
(b) Graphic labelling and reference
(c) Formatting in term of uniformity of spacing, font size, paragraphing, grammar, spelling and page number, provision of appendices, reference, and photographic records
(d) Submit in MS WORDS format
Buy Custom Answer of This Assessment & Raise Your Grades

Shared with
My Assignment Help SG Editorial Team – Building Diagnostics desk
A student shared this brief with our team; personal details have been removed. Our Building Diagnostics desk works on tasks like this and can guide you on how to approach it.
- HS8738 Gerontological Nursing Assignment 2026: Ageing in Place and Singapore’s Action Plan for Successful Ageing | NYP
- PP5001 Creative Helping Practices Assignment Brief: Critical Evaluation of Green and Blue Spaces (3,000 Words)
- ANL252 Python for Data Analytics ECA July 2026: Payment Delay Data Cleaning, Charts and Regression | SUSS
- EG7060 Mental Wealth: Professional Life Coursework 2026: Engineering Management Case Study Report | UEL at LSBF
- SOC252 Religion and Society ECA July 2026: AI Agents and Religious Authority Essay | SUSS
- Information Studies Written Report: Critiquing a ChatGPT Essay on Values, Ethics and IPR | NTU
- BML701 Changing Context of Work: HR&OD Business Report on PESTLE, 6Ps and Change
- ABS103 ECA July 2026: “A Day in the Life” Intelligence Video and Reflection | SUSS
- ICT340 NEA Hawker Centre Inspection ECA July 2026: Application Analysis and Design | SUSS
- Social and New Media Written Report (40%): Website Message and Method Analysis with Strategic Recommendations | Murdoch
