BPM309: Cost Management for M&E Works Assignments
BPM309: Cost Management for M&E Works Assignment, SUSS, Singapore An M&E Engineer prepares the tender drawings (Figure Q1.1) for a hose reel and dry riser system
Question 1 An M&E Engineer prepares the tender drawings (Figure Q1.1) for a hose reel and dry riser system. Briefly describe the scope of works of the fire protection system to be installed and illustrate the associated measurement rules and…