BPM209 Cost Management for C&S Works Assignment, SUSS, Singapore: Prepare a take-off list with the corresponding CEMS clauses and unit of measurement for measuring
Question 1
With reference to Figure Q1.1,
(a) Prepare a take-off list with the corresponding CEMS clauses and unit of measurement for measuring the excavation and reinforced concrete work.
(b) Apply measurement techniques to take off quantities for the excavation and reinforced concrete works.
Specifications:
(i) All excavation work shall commence from the existing ground level.
(ii) Lean concrete shall be of grade 15 and 75 mm thick.
(iii) The raft foundation slab shall be 400 mm thick.
(iv) All reinforced concrete shall be of grade 30.
(v) Formwork shall be of sawn timber.
(vi) Reinforcement for raft foundation slab shall consist of two layers of Fabric Mesh type A393 weighing 6.16 kg/m 2
(vii) Concrete cover is 50 mm thick
Hire a Professional Essay & Assignment Writer for completing your Academic Assessments
Question 2
(a) Compare the difference between a trial pile and a working pile and the different types of static load tests applied to them.
(b) With reference to Figure Q2.1, prepare a take-off list with the corresponding CEMS clauses and units of measurement for measuring reinforced concrete bored piles including reinforcement.
(c) With reference to Figure Q2.1, apply the measurement technique to take off quantities for the reinforced concrete bored piles.
(d) With reference to Figure Q2.1, apply the measurement technique to take off quantities for the reinforcement work.
Specification for Piling:
(i) All reinforced concrete bored piles shall be 1100 mm in diameter, of grade 35 concrete, and reinforced with 22 H28 mm diameter main bars and H12 mm diameter circular links @ 250 mm centers.
(ii) The estimated bored depth of piles is taken from the existing ground level.
(iii) All piling operations shall commence from the existing ground level.
(iv) Maintained working load test shall be executed on two piles up to 1.5 times the designed working load of 220 tonnes.
(v) Concrete cover shall be 75 mm thick.
(vi) Assume 50 working piles to be installed.
(vii) Rock is encountered at the last 500 mm depth of boring.
Buy Custom Answer of This Assessment & Raise Your Grades
Question 3
With reference to Figure Q3.1, identify the scope and interpret the drawing.
(a) Identify the relevant CEMS rules relating to sub-heading and classification
requirements and explain how they are applied to the measurement of the steel roof trusses which do not form a major part of the structure.
(b) Apply measurement technique to take-off quantities for the steel roof truss.
Stuck with a lot of homework assignments and feeling stressed ? Take professional academic assistance & Get 100% Plagiarism free papers
Calling all Singapore University of Social Science (SUSS) Students! Struggling with your BPM209 Cost Management for C&S Works Assignment? Look no further! We offer top-quality TMA (tutor-marked assignments) and individual assignment assistance in Singapore. Our expert Homework Helpers are here to support your academic journey. Trust us for the best assignment help in Singapore, and we'll guide you through tasks like preparing a take-off list with CEMS clauses and units of measurement for measuring. Don't let assignments hold you back; pay our experts and excel in your courses.
- 5010MKT/2005MKT Ice Cream Launch Marketing Plan: Singapore Strategy for Growth, Profitability & Sustainability
- BUS306 Audit Risk Assessment : Outback Retail Ltd Case Study for ERP, BNPL & Governance Evaluation
- CVE2322 Concrete Materials Laboratory Report: Observations, Analysis, and Reflections from SIT Lab and iLab Visit
- PSB6008CL Social Entrepreneurship Assignment: Case Study on Impact-Driven Innovation & Leadership in a Social Enterprise
- PSB6014CL Project Management Assignment : Digital Transformation Case Study in Online Banking Services for a Leading Financial Institution
- Financial Management Assignment : Global Case Study for Corporate Valuation, WACC & Scenario-Based CAPEX Analysis
- CM1040 Web Development Assignment : HTTP & Responsive Design Case Study for Accessible and Secure User Experience
- Master Budget Report 2025: SBS Industrial Budgeting, Performance & Financial Analysis
- 7WBS2009 Financial Analysis Assignment Report: Investment Decision Between Alpha plc and Beta plc for Gamma Company
- PSB7003CL Entrepreneurship and Innovation Assignment Report: Evaluating Innovation Practices in Organisation
UP TO 15 % DISCOUNT